roadstuds-logo

Roadcraft acquire Flemings’ Road Stud Assets

On the 6th June, 2018 Fleming & Company sold all their Road Stud assets and their Road Stud business as a going concern to Roadcraft Safety Products Ltd. Flemings have worked in partnership with Roadcraft for over 20 years and together developed the market leading 301 Road Stud Casting which is manufactured here in the Read More

Highway Markings Product of Choice

In 2008, Highway Markings from the Republic of Ireland were the very first contractor to buy and install the 301/290 road stud from Fleming & Company. Their first purchase was in excess of 2,000 units. Since then, the company have continued to purchase the 301/290 studs and now it is the only product they use Read More

In 2008, Highway Markings from the Republic of Ireland were the very first contractor to buy and install the 301/290 road stud from Fleming & Company. Their first purchase was in excess of 2,000 units. Since then, the company have continued to purchase the 301/290 studs and now it is the only product they use on the Irish motorway network.

Danny Murphy – Managing Director says;

into-the-future-image“When we install this product, we expect a minimum operation life of seven years from the 3M reflective lens, the product does not disappoint. In urban areas with street lighting the 301/290 road stud performs equally well under dipped or full beam headlights, unlike the traditional glass based road studs. With our clients now demanding better performance and lower maintenance costs, the 301/290 fulfils this criteria too.

We are more than happy to endorse/recommend the 301 290 road stud to all our clients.”

 

 

 

M74 Completion, Fullarton Road to West of Kingston Bridge

Markon were appointed by Interlink M74 Joint Venture to undertake the Road Markings and Road Studs on the M74 Completion project in 2011. Having used 301 Road Studs, supplied by Fleming & Co, for a few years across the Scottish Trunk Road Network we selected them for this project and installed in excess of 6,300 Read More

P6088152Markon were appointed by Interlink M74 Joint Venture to undertake the Road Markings and Road Studs on the M74 Completion project in 2011.

Having used 301 Road Studs, supplied by Fleming & Co, for a few years across the Scottish Trunk Road Network we selected them for this project and installed in excess of 6,300 units over a period of 2 months in early 2011.

The motorway has now been open to traffic for 5 years and a recent survey has confirmed that all of the studs continue to perform to a good standard and deliver safety benefits by delivering high levels of retroreflectivity in excess of European Standards.

Having now installed many thousands, we continue to select the 301 Roadstud due to their long term performance and ease of installation and recommend them for use on all categories of road.

SCOTT YUILL
DIRECTOR/GENERAL MANAGER,
Chairman, RSMA

Irish Eyes Still Smiling

In December 2015 Strachan Hill and Douglas Allport of Fleming & Company revisited Dave Schuller Operations Manager at Eurolink Motorway Operation M3 Ltd to find out how the 301/290 reflecting road stud was continuing to perform on the M3 in Ireland 4 ½ years on from his previous testimonial “Passing the snowplough test” and 5 Read More

In December 2015 Strachan Hill and Douglas Allport of Fleming & Company revisited Dave Schuller Operations Manager at Eurolink Motorway Operation M3 Ltd to find out how the 301/290 reflecting road stud was continuing to perform on the M3 in Ireland 4 ½ years on from his previous testimonial “Passing the snowplough test” and 5 ½ years since the road was opened to traffic.

When we last spoke to Dave in July 2011 for our Online News Ireland had experienced one of the harshest winters for many years with temperatures dropping as low as minus 17 degrees Celsius, and snowploughing going on round the clock to keep the new* toll motorway operational. This proved to be a major test for the maintenance crews and their equipment, not to mention the 301/290 road studs. At that time Dave was delighted to report that despite the extreme weather conditions the road remained opened and no road studs were lost as a result of the winter maintenance operations.

On our recent visit Dave said “the 301/290 road studs have surpassed our expectations from a maintenance and durability perspective, the retro reflectivity is still excellent and performing beyond the requirements of the DMRB** standard resulting in the clear delineation of lanes, which is vital for the safety of our roads’ users, especially in adverse weather conditions. Since the road opened in 2010 we have replaced only 18 reflectors, making the 301/290 almost maintenance free. This is resulting in real whole life cost savings, as we have only had to carry out 1 maintenance intervention. The cost of maintenance can add up very quickly, typically replacement works will involve Traffic Management, Non Availability Payments (NAP)*** plus replacement product costs. With the 301/290 this type of cost is kept to a minimum. In addition to the cost benefits the health and safety of our personnel has been improved as they are not frequently being exposed to replacing road studs in live traffic situations and the road users are also benefiting as their journeys’ are not being delayed by lane closures.” In summing up he went on to say “based on my experience of the 301/290 road stud in this very demanding motorway scheme I would have no hesitation in recommending the product to others.”

Fleming and Company are delighted with the product performance and customer satisfaction and will continue to work closely with Dave and all our other road stud customers to ensure continued market support of the 301/290. HPIM0891

*motorway opened officially to traffic June, 2010
** Design Manual for Roads and Bridges
***lane occupation charges payable to the National Roads Authority (NRA)

P6088077

M74 Glasgow The missing link

The project completes the missing link between the end of the M74 at Fullarton Road Junction near Carmyle and the M8 motorway west of the Kingston Bridge near Glasgow City Centre. Approximately 6000-301/290 Road Studs have been installed on the 5 miles (8 kilometre) motorway comprising three lanes in each direction and a hard shoulder Read More

CNV00002

Ireland reflects on 301/290 Performance

3M™ Marker Series 290 roadstuds have been used on a 24km stretch of brand new motorway in Ireland, which opened in March 2010. The construction of a major inter-urban route connecting Dublin and Waterford is a key part of the Irish government’s strategy for economic growth and road safety improvements. This project moved one step Read More

home-side-image-1

Cheshire 290 road studs tested at nine year

Series 290 Road Stud The 3M™ Marker Series 290 Reflecting Road Stud has long been considered the leading surface mounted road stud available and this was supported by Cheshire County Councils report on road stud performance. 3M has combined innovative technologies such as advanced optical design, hard ceramer coatings and computer aided contruction design to Read More

HPIM0891

Passing the snowplough test

The harshest winter for many years meant an early test of strength for 3M road studs in Ireland. None of us will need reminding that November and December brought traffic chaos to much of Europe, with snow and freezing temperatures closing airports, halting trains, and blocking many major highways, never mind the minor roads. It Read More